July 21, 2018 went down the boat down the river Vyatka. The descent was not great, about 5 kilometers by distance on the water. Swimming means – two PVC inflatable boats. One boat with Global Marine 3,5. Started movement in the area of Splavnaya Street, Kirov. Finished in the area of the old port, opposite the Titanic. The motor was switched on periodically – only if it was necessary to swim across from one bank to Vyatka, to the other. In the morning, even though there was a sun, a strong wind met us. On the wide smooth surface of the river there were high waves. Closer to dinner, the wind subsided, the waves calmed down and complete calm arose on the river. Closer to the beach found a desert island. On the island hoisted the antenna on the range of 14 MHz. I worked on the air and it was not without difficulty that I established 3 connections. For all the time traveling, they bathed, sunbathed, cooked food on the fire. Already in the evening they came to the shore from the city of Kirov, safely gathered the boats in bags and got to the house.
Language switcher
-
Recent Posts
- Planting an elm tree 17.07.2020
- Planting an elm tree 17.07.2020
- Запуск двигателя через преобразователь напряжения 1 фаза в 3 фазы 30.06.2020
- Запуск двигателя через преобразователь напряжения 1 фаза в 3 фазы 30.06.2020
- Crafting unusual axes 19.06.2020
- Crafting unusual axes 19.06.2020
- Motorcycle wheel bearing replacement 17.06.2020
- Motorcycle wheel bearing replacement 17.06.2020
- Shortening a motorcycle or bicycle chain 29.05.2020
- Shortening a motorcycle or bicycle chain 29.05.2020
- Comparison of performance of Internet servers based on CentOS 7 using sysbench 25.03.2020
- Comparison of performance of Internet servers based on CentOS 7 using sysbench 25.03.2020
- Anvil installation and first check 04.09.2019
- Anvil installation and first check 04.09.2019
- Anvil 130 kg 02.09.2019
Archives
Categories









